![]() |
|||
|
After
kilning the goods are quality graded and packed to agreed specifications.
In end-cutting it is possible to do special lengths and stamps. Storage
times are minimised, handling time at the mill is reduced to the minimum
and kilning is timed to the last days before delivery. All wishes
of the client are realized by continual training of personnel..
If required the packages can be protected with paper on top or 5-sides plastic, to guarantee the right moisture. |
||
| U / S U / S KW S / F V VI EXP VI DOM |
MULTI *MULTI* M * I M - I +MUL+ MUL |
||
![]() |
|||
| PEFC/02-31-81 | |||
| ISPM 15/FI-KTTK-16122 | |||